My first activity today involved meeting with a local firm to film a pitch. The aim was to film enough footage to make a 3-minute film. Camera positioning was important to consider to make sure that lighting fell correctly, eye level was in line and that the background didn't include any undesirable objects in shot. Overall we captured about 20 minutes of footage which was later to be edited into the final 3-minute version.
Following this I was assigned to an account to co-ordinate their flyers. This required me to collate a range of product images that would be needed. The account had only recently been taken over by Partnerships for Marketing so the images were spread across a number of CD's. I consolidated the images onto one area to both create a backup as well as improve future efficiency when searching for images to use in conjunction with the account. Once the correct images had been found I uploaded these onto Basecamp ready for the designer to start work.
No comments:
Post a Comment